top of page
  • Writer's pictureFahad Gohar

#SLOPE IT. #SHORE IT. #SHIELD IT.

Updated: Jan 4, 2019

The primary hazard of trenching and excavation is employee injury from collapse. Soil analysis is important in order to determine appropriate sloping, benching, and shoring. Additional hazards include working with heavy machinery; manual handling of materials; working in proximity to traffic; electrical hazards from overhead and underground power-lines; and underground utilities, such as natural gas



Protective Systems There are different types of protective systems.

Benching means a method of protecting workers from cave-ins by excavating the sides of an excavation to form one or a series of horizontal levels or steps, usually with vertical or near vertical surfaces between levels. Benching cannot be done in Type C soil.

Sloping involves cutting back the trench wall at an angle inclined away from the excavation.

Shoring requires installing aluminum hydraulic or other types of supports to prevent soil movement and cave-ins.

Shielding protects workers by using trench boxes or other types of supports to prevent soil cave-ins. Designing a protective system can be complex because you must consider many factors: soil classification, depth of cut, water content of soil, changes caused by weather or climate, surcharge loads (e.g., spoil, other materials to be used in the trench) and other operations in the vicinity.


0 comments

Recent Posts

See All
bottom of page